I am starting this thread to share the joys, and frustrations of being the GC in new home build.
Last year we bought 11 ac that is on a lake, but the buffer is large enough that you can’t see the lake, you also can’t access the lake.
Then you might being saying why the hell did you buy it? Well to one side is 36 ac that the water authority owns, so there will not only be no building, there wil not even be any trees cut on it.
They own another 15 ac that wraps around us, so it is really like having close to 50 acs that we ca hike on, bike in, just no power vehicles or water access. Our house is going to be in the edge of a 1 af field, about 2000’ feed down a drive way.
We are building a 1.5 story log cabin, this has been a goal since we got married 26 years ago and it happening. The loan is done, the money there to be drawn on as needed.
The power was run under ground to the site.
The well was dug yesterday, 320 ft 50 gpm.
Grading to start in a few weeks to get basement set and builder can do the dry in.
We will be doing all finish work, plumbing, electrical, etc.
Here is the lot
Any comments, criticism, suggestions, 4are all welcome om.
Last year we bought 11 ac that is on a lake, but the buffer is large enough that you can’t see the lake, you also can’t access the lake.
Then you might being saying why the hell did you buy it? Well to one side is 36 ac that the water authority owns, so there will not only be no building, there wil not even be any trees cut on it.
They own another 15 ac that wraps around us, so it is really like having close to 50 acs that we ca hike on, bike in, just no power vehicles or water access. Our house is going to be in the edge of a 1 af field, about 2000’ feed down a drive way.
We are building a 1.5 story log cabin, this has been a goal since we got married 26 years ago and it happening. The loan is done, the money there to be drawn on as needed.
The power was run under ground to the site.
The well was dug yesterday, 320 ft 50 gpm.
Grading to start in a few weeks to get basement set and builder can do the dry in.
We will be doing all finish work, plumbing, electrical, etc.
Here is the lot