Work is supposed to start tomorrow rebuilding the wall of my barn. It was pushing in bad and a few years ago I dug the dirt away because it was pushing on the barn.
It going to take 1000 12" block, they'll be filled with rebar and concrete. A footer 3' below the floor will make it about 11' tall and 34' wide with 8' returns on each side, and pilasters to support 5 beams. A couple beams need replaced while we're at it.
A few before pics.
I'll post more pics as the work progresses.