Haven't updated for a bit, but I am done with this install. Everything for the outdoor wood boiler is buried, plumbed, hooked up, wired, filled up, and working. House is a very comfy 72 degrees, and the shop I have no clue. I guess I lied. I still need to wire in the fan blower and thermostat for the heat exchanger in the shop. I am just letting it flow the hot water thru it currently. Good enough to get some heat in there, just not quite good enough for a steady comfortable heat.
Having the bulk majority of it done is TOO TOO TOO good though. That was a dandy of a project. Wiring in the fan blower and thermostat is a 20min deal. Just need to clear out some stuff in order to wire it in.