Welcome to TheOhioOutdoors
Wanting to join the rest of our members? Login or sign up today!
Login / Join

Fury’s garage/man cave project

Sgt Fury

Sgt. Spellchecker
13FABE69-C48E-4E42-8E15-95E1B766E3D9.jpeg
9C738FD6-E4D7-476E-A4CA-C2468D5F026C.jpeg
0FBD8F2B-8738-4005-A798-1F5CCED346D9.jpeg
72B5EA6F-935F-41D9-83C5-4A50525FF27C.jpeg
97FBE7F6-0126-4AE4-8927-A5A2CB3ADC10.jpeg
F882437D-0397-4F96-99CC-706FB495B8C8.jpeg
B2743153-BC8E-4BD4-A372-DDEC678F3AD1.jpeg

Day 2 in the books...these guys are fast.
 

Floki

Junior Member
1,198
70
That’s going to be bad ass. After it’s done ya got to promise to tell us about the first argument ya have in it with wife.😂😂😂😂 From one man cave guy to another. Your gonna have a lot of fun in that thing!!
 
  • Like
Reactions: 5Cent and Sgt Fury

Hoytmania

Dignitary Member
Supporting Member
11,515
181
Gods Country
What kind of heat are you putting in it? It looks like a great candidate for a radiant floor system heated by a hot water heater. Once you get that concrete up to 100 degrees. You'll be comfier than a big in a rug
 
  • Like
Reactions: Sgt Fury and 5Cent

Sgt Fury

Sgt. Spellchecker
F74F9750-464D-4846-9711-34334280287F.jpeg
7A871DC7-68B2-4E6F-9A51-A36DF4508246.jpeg
9AAFD340-5C3D-48DA-8381-BFAF0B4C0F82.jpeg
E6FE85DD-F63F-4058-B8BD-60C813281331.jpeg
D7E69BAC-63F2-4F43-BEEE-06F7B5C1E41D.jpeg

They finished the garage today...three days total. They got it done real fast! Calling tomorrow to find out when the concrete is coming...they originally told me 7-10 days after completion but with this pandemic going on, maybe they are short of work and can get it done faster. After that, the garage doors go in then the blow in insulation in the attic. They couldn’t get brown entry doors but did give me a gallon of paint that they said is a perfect match. Then comes the fun part...finishing the inside!😊
 

finelyshedded

You know what!!!
Supporting Member
32,628
274
SW Ohio
View attachment 100240View attachment 100241View attachment 100242View attachment 100243View attachment 100244
They finished the garage today...three days total. They got it done real fast! Calling tomorrow to find out when the concrete is coming...they originally told me 7-10 days after completion but with this pandemic going on, maybe they are short of work and can get it done faster. After that, the garage doors go in then the blow in insulation in the attic. They couldn’t get brown entry doors but did give me a gallon of paint that they said is a perfect match. Then comes the fun part...finishing the inside!😊

WOW! THEY WERE FAST!!!! LOOKS AWESOME TOO SARGE!!!!! 😎👍🏻
 
  • Like
Reactions: Sgt Fury

Sgt Fury

Sgt. Spellchecker
WOW! THEY WERE FAST!!!! LOOKS AWESOME TOO SARGE!!!!! 😎👍🏻
I believe they were Amish...but not Shiite Amish.😂 They didn’t have beards and the standard Amish clothing but my friend was over watching them work and said he thought they were Amish by the way they talked. I was very impressed by the way they worked as a team. The company name is Shirk Pole Buildings and they are from Pennsylvania.
 
  • Like
Reactions: Dustinb80

Fletch

Senior Member
Supporting Member
6,204
136
Nothing short of fantastic... Looks great... Now is there a wall going between garage and room??What's going to be interior walls??
 
  • Like
Reactions: Sgt Fury

Sgt Fury

Sgt. Spellchecker
Nothing short of fantastic... Looks great... Now is there a wall going between garage and room??What's going to be interior walls??
A wall is going between the garage part and the man cave. After insulating the outside walls and running electric, the garage is going to be finished with Sheetrock. The man cave is going to be knotty pine.