Second estimate. Does not address the garage foundation issue.
Simple copy and paste below.
WE HEREBY SUBMIT SPECIFICATIONS AND ESTIMATES FOR:
EQUIPMENT, LABOR AND MATERIALS TO STABILIZE THE FOUR CRACKED AND SLIGHTLY BOWED BASEMENT WALLS.
SCOPE OF WORK TO INCLUDE:
INSTALL SIXTEEN STEEL 8” x 18.75# “C” CHANNELS ON THE BASEMENT WALLS AS FOLLOWS: FIVE (5) ON THE FRONT WALL
FIVE (5) ON THE N. SIDE WALL
THREE (3) ON THE BACK WALL
THREE (3) ON THE GARAGE SIDE WALL
THE CONCRETE FLOOR WILL BE PENETRATED AND PATCHED TO SECURE THE BOTTOM OF THE STEEL CHANNELS.
PRELOAD THE TOP OF THE “C” CHANNELS WITH ADJUSTABLE JACK SCREWS BRACED WITH 2 x 10s, GLUED AND SCREWED BETWEEN / BELOW THE FLOOR JOISTS.
LENGTH OF STEEL - _____________________
FLOOR JOIST SIZE - _____________________
GUARANTEE:
STEEL CHANNEL BRACING IS A STABILIZATION METHOD. THIS SCHEDULE OF WALL BRACING WILL INSURE THE STEEL BRACED WALLS ARE STRUCTURALLY SOUND.
WE GUARANTEE THAT THE STEEL CHANNEL BRACES AND THE BLOCK DIRECTLY BEHIND THE BRACES WILL NOT MOVE. GUARANTEE FOLLOWS THE ADRESS AND IS LIFETIME TRANSFERRABLE.