Sad thing
If your gas line is plastic and yellow , not the older Orange
And they just cut the line
It should take a guy 2 min - 3 min to fix
Just need a short section of pipe and 2 Perfection couplings
Stab a coupling on the new pipe
Cut the old pipe
Stab on the coupling on the old pipe
Cut the old pipe
Cut the new pipe to length
Stab the coupling on to the old pipe
Stab the new pipe into the coupling
No need to even turn off the gas if it is a low pressure line
If med or high pressure , you just need to crimp the line first
If they need to replace the line to the curb valve
It just takes 1 less Perfection coupling , but a curb coupling would be needed
Then it should take less than 1/2 hr after the hole was dug
It is simple
They flat don't care about the consumer
Either you buy their gass or you don't