SITREP: I've done a few 😉🤣

Seawall is 100% complete.
1000027611.webp

1000027610.webp

1000027607.webp

1000027596.webp


Surveying is being done Monday.

Clearing for two of four remaining structures is done, fill incomming, starting to spread and compact the base tomorrow/Fri.
1000027597.webp


Power plan/site distro is at the engineering stage. Strawman schedule from FPL Fri.

Trying for a couple more bids for metal building and greenhouse.

Metal building 36'x70'

Greenhouse 30'x50'



Laser leveled metal building and greenhouse today and have to deal with some grade/fall of the land. We started with wanting the floor levels to be equal between the two buildings but the grade makes that an issue.

Plan to house much of the materials for use in the greenhouse in the metal building, so 4' man/equipment doors on both buildings opening in on Greenhouse and out on metal building. Think covered breezeway.

We're going to drop the greenhouse floor lower than the barn over the 8'. This is what I got from GROK.


1000027614.webp


We agreed on the sqft and general locations last week then squared and staked, got.

Our redneck way forward.

1000027578.webp
 