Man that's weird especially cuz it's a retaining wall, that's gonna be backfilled right? The firm I work firm we've had this issue a lot recently and it's mostly b/c the contractors don't want to place the bars in the ftg cuz it's a pain in the ass for the mason to align his blocks perfectly with the bars. One thing they'll do on smaller projects is lay the first wythe of blocks then come back and drill and epoxy the bars into the footing.
Find anything cool during the project Sam?
(something old or forgotten, gold, silver or artifacts of historic value)
( J's birth certificate maybe?) lol
You thought Obamas was hard too find???? Wait till you look for mine hahaha!!!!!!
Looks like Hank approves
Every job needs a foreman.:smiley_bril:
Btw I learned about Ledgelok screws doing this. Supposed to be as strong as 1/2" lag bolts, self drilling, built in washer. They go right in with an impact driver.