Welcome to TheOhioOutdoors
Wanting to join the rest of our members? Login or sign up today!
Sign up

Basement Project 2011

Schu72

Well-Known Member
3,864
113
Streetsboro
Not really a how to.... Just something to keep track of the progress. This was day one. Probably 50+% of framing done.

2011-12-14210757.jpg


2011-12-14210835.jpg
 
I like the way your think Hoot. You have got to think about maintenance down the road. That is how my remodel jobs go too. "Um, here is a pipe. I better leave access to it. If not, this is the pipe that will leak someday." lmao
 
Great start! I just bought a great basement flooring product called place-n-go flooring. It's not cheap, but it's awesome stuff.