From my earlier post #91; the hill-side shot of the pad..
Here it is about 24 hours later and the derrick has been laid down. The cranes will then break down the derrick tower in 2-3 pieces to be loaded on a truck each and driven to the next pad. Most all the remaining drilling equipment will be gone in 48 hours.
Here it is about 24 hours later and the derrick has been laid down. The cranes will then break down the derrick tower in 2-3 pieces to be loaded on a truck each and driven to the next pad. Most all the remaining drilling equipment will be gone in 48 hours.