Welcome to TheOhioOutdoors
Wanting to join the rest of our members? Login or sign up today!
Sign up

The TOO dump thread


B/C the customer moved our ship date from shipping the 1500 parts Monday to needing them Monday. I have to do a tool commissioning, we will run 60 test parts, I have to check them and give the yay/nay. If its good, start production. If not, redesign and we are fucked.
 
13ac2c1178ae78f95a9e4deba84a87bf.jpg


Son of a bitch. Slip on my way down the ladder and put a shit load of weight on my thumb. Burning like a bitch right now, still going canoeing tomorrow, no fucks given.