Welcome to TheOhioOutdoors
Wanting to join the rest of our members? Login or sign up today!
Login / Join

Fury’s garage/man cave project

Sgt Fury

Sgt. Spellchecker
3C6F0914-AF62-42D5-9EA9-790A9FE6A8E2.jpeg
54A1F161-1BC4-48CC-9BAA-CAC5CDB72A28.jpeg
78F16E80-C2CA-42C7-AA0C-F47DA1DA8C11.jpeg
6AA4D9F4-97D0-44EF-8599-3E8B0A411BC6.jpeg
ED3119D2-EF54-4DE3-A000-C0C76F7CB2B9.jpeg

Dug the trench today with the kabota...plumber coming tomorrow or Wednesday to run water and gas lines. Electrician coming next Tuesday to run 100 amp service out there along with cable tv and an extra conduit for future use (if needed). Got the first coat of paint up and will start second coat tomorrow. Also taped the doors and windows on the inside in prep for painting them brown in a couple of days.
 

Sgt Fury

Sgt. Spellchecker
AD5F2CCC-8902-40AF-829A-8DC78F357220.jpeg
84F104EC-2700-49E0-9822-08E06577386C.jpeg
12D529EA-A6E0-4F32-A339-05A66768318E.jpeg
188391DE-3564-4DDE-A97F-C09EFF196516.jpeg
09DB9F32-9B80-4AD7-975B-38D9AB92B920.jpeg
DEC11A77-89C8-48BA-BD29-0DDE1E4FA395.jpeg

Got the last of the OSB put up today...water line was run inside to the utility room and gas line run to the back of the bldg just outside the utility room. Taped the windows and doors in prep for painting tomorrow. Wife wanted the windows/doors painted brown...white was the only color the garage builder offered. Hope to finish painting tomorrow but may take two days. The electrician comes Tuesday.
 

Fletch

Senior Member
Supporting Member
6,078
118
She’s doing better as of today. She’s had a 104 temp since last Friday or so and today it dropped to 100. She said it’s the best she’s felt in a while. Thanks for asking.👍😊
Glad to hear she feeling better...(y)
 
  • Like
Reactions: Sgt Fury

Sgt Fury

Sgt. Spellchecker
FD12851A-B8DD-4441-93C2-CE6BF238E03B.jpeg
63872E50-4680-462D-8645-9F572AF74E26.jpeg
54BC8456-C0DC-481D-A95C-42DC575EDC1D.jpeg
54D4F775-DBE9-4423-8EEF-8C36A9E1870C.jpeg
B80BC866-7EA7-49FC-A65F-FC5AEA1FF01D.jpeg
1BECB402-9955-40B5-8959-78DCD19E3132.jpeg
3859DA97-C184-49E2-8AC0-F12C02583B1E.jpeg
A5BB4049-DB7A-477D-9368-376331CCD576.jpeg

Got the electric run from the house to a 100 amp breaker in the utility room...they also ran cable tv and a spare conduit. I Painted the doors...the outside doors still need another coat. Taped the shelves for painting and got the workbench framed out. Need to get 3/4” plywood for the top and finish painting. Also need to fill in the trench. After the bldg and electric inspector come, then I’ll get started on the bar area. Getting the electric, water and gas run to the garage was a task that I’m glad is behind me. Now the fun work starts.